What was found
FUSELAGE FLOORBEAM ATTACH CLIPS ARE CRACKED (2) INBOARD AND OUTBOARD FS 280.00 RBL 9.0. DISCOVERED DURING C-CHECK INSPECTION. REPLACED CLIPS IAW CRJ SRM 51-40-11, 51-23-00, 51-42-06, 51-42-21, 51-42-13, 51-25-16, 51-21-11.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE FLOORBEAM ATTACH CLIPS ARE CRACKED (2) INBOARD AND OUTBOARD FS 280.00 RBL 9.0. DISCOVERED DURING C-CHECK INSPECTION. REPLACED CLIPS IAW CRJ SRM 51-40-11, 51-23-00, 51-42-06, 51-42-21, 51-42-13, 51-25-16, 51-21-11.