Service difficulty report · Fuel Nozzle · Cndair CL6002B19

Difficulty date
October 23, 2015
Submitted
October 23, 2015
Operation
Air carrier
Aircraft
N906SW
Make and model
Cndair CL6002B19
Aircraft serial
7510
Aircraft time
35,676 hours, 32,069 cycles
Part
Fuel Nozzle
Condition
Out Of Position
Location
Apu
Stage of operation
LD
How discovered
O
Nature of condition
W, A
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER LANDING, STARTED APU AND RECEIVED AN ITT SPIKE. ATC REPORTED TO THE CREW THEY SAW FLAMES FROM THE RT ENGINE. RT ENGINE PARAMETERS NORMAL. REINSTALLED APU NOZZLE IN CORRECT POSITION, LEAK CHECKED GOOD.