What was found
PAX DOOR HINGE HALF ON FUSELAGE SIDE HAS GROOVED LANDS #4 TO 26 AND ALL LUG HOLES EGG SHAPED. (C-CHECK) RO: 04/11/2019 REMOVED AND REPLACED THE PAX DOOR HINGE HALF IAW SRM. LEAK CHECKS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAX DOOR HINGE HALF ON FUSELAGE SIDE HAS GROOVED LANDS #4 TO 26 AND ALL LUG HOLES EGG SHAPED. (C-CHECK) RO: 04/11/2019 REMOVED AND REPLACED THE PAX DOOR HINGE HALF IAW SRM. LEAK CHECKS GOOD.