What was found
L/H FS280 CENTER FLOOR BEAM OUTBD CLIP CRACKED (C-CHCEK) RO: 10/01/2019 REMOVED CRACKED FS280 LBL9 OTBD CLIP ANGLE AND INSTALLED NEW, FABRICATED, CLIP ANGLE IAW REO.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
L/H FS280 CENTER FLOOR BEAM OUTBD CLIP CRACKED (C-CHCEK) RO: 10/01/2019 REMOVED CRACKED FS280 LBL9 OTBD CLIP ANGLE AND INSTALLED NEW, FABRICATED, CLIP ANGLE IAW REO.