As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
PAX DR RIGGING NOT POSSIBLE AFTER REPLACEMENT OF THE PAX DR FUSELAGE HINGE REPLACEMENT (C-CHECK) RO 2/14/2020 REMOVED AND RE-INSTALLED PAX DOOR HINGE (FUESLAGE SIDE) REF CRJ900 SRM. PERFORMED FUSELAGE PRESSURE CHECK REF CRJ900 AMM. NO DEFECTS NOTED. SEE CONTINUE CARD FOR WORK PERFORMED