What was found
D: FASTENERS DAMAGE FOUND FROM FS 330 TO FS 394 BETWEEN STGR 26RH AND STGR 22RH. COMPLIED WITH TEMPORARY REPAIR PER SRM. REPAIR VALID UNTIL THE NEXT HEAVY MAINTENANCE CHECK OR FOR 6,000 FLIGHT HOURS MAXIMUM, WHICHEVER OCCURS FIRST. PERMANENT REPAIR DUE BY NEXT HEAVY CHECK OR TAT 34425.35, WHICHEVER COMES FIRST. C: MCI RA: 38509 NOTE: REINSPECT EVERY 1200 HOURS *** DO NOT CLOSE UNTIL PERMENANT REPAIR *** (C-CHECK) RO 3/6/2020 PERFORMED PEREMANENT REPAIR TYPE #2 FOR ALL AFFECTED FASTENERS BETWEEN FS330 - FS394 BETWEEN STGRS 26R - 22R REF CRJ-900 SRM. NO LEAKS NOTED. COMPLIED WITH TASK CARD.