Service difficulty report · Vane · Cndair CL6002B19

Difficulty date
February 18, 2020
Submitted
March 27, 2020
Operation
Air carrier
Aircraft
N936SW
Make and model
Cndair CL6002B19
Aircraft serial
7726
Aircraft time
40,899 hours, 36,569 cycles
Part
Vane
Condition
Chafed
Location
Te Flap
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LH INBD FLAP VANE IS CHAFFED ON L/E AT APPROX WS 95.0 (C-CHECK) RO 3/25/2020 REMOVED CHAFFE DAMAGE ON L/H, I/B FLAP VANE L/E AT W/S 95.0 PER CRJ-200 SRM. ORIGINAL MATERIAL THICKNESS IS 050". REMAINING THICKNESS IS .025". MATERIAL LOSS IS .025". AREA FOUND TO BE OUT OF LIMITS PER BA REO. REMOVED AND REPLACED L/E SKIN PER CRJ-200 SRM. TOOLING USED: DEPTH DIAL GAGE: AV 5185, CAL DUE DATE: 11/21/20. TOOLING USED: DEPTH DIAL GAGE: AV 5185, CAL. DUE DATE:11-21-20.