As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
R/H I/B FLAP VANE L/E IS CHAFED AT THE I/B LOCATION. (C-CHECK) RO 4/21/2020 BLENDED CHAFE ON R/H I/B FLAP VANE L/E I/B LOCATION AND FOUND TO BE OUT OF LIMITS REF. BOMBARDIER REO & CRJ 200 SRM. REMOVED AND INSTALLED NEW R/H I/B FLAP VANE L/E I/B REF. BOMBARDIER DWG AND CRJ 200 SRM. COMPLIED WITH TASK CARD.