What was found
LH 280 BEAM HAS PITTING AND CORROSION ON THE RADIUS BETWEEN RBL 9 AND LBL 9 (C-CHECK) RO 4/23/2020 REMOVED AND REPLACED LH 280 BEAM REF DWG
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LH 280 BEAM HAS PITTING AND CORROSION ON THE RADIUS BETWEEN RBL 9 AND LBL 9 (C-CHECK) RO 4/23/2020 REMOVED AND REPLACED LH 280 BEAM REF DWG