What was found
COMPLY WITH SCHEDULED MAINTENANCE CODE: AD 40000 FC-COMPLY WITH PARAGRAPH (J) OF AD. C-CHECK RO 10/4/2020. COMPLIED WITH PARAGRAPH (J) OF AD BY: DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION (FS) 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL OF BOMBARDIER TR AIRWORTHINESS LIMITATIONS, OF PART 2 OF THE BOMBARDIER CL-600-2B19 MRM. MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO) MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE. COMPLIED WITH SERIAL NUMBER 782. COMPLETED SKYWEST TASK CARD