What was found
FS 409.00+128 LBL 18 INTERIOR BULKHEAD POST POSSIBLE CRACK OUTER BOTTOM AFT CORNER AREA, MARKED. C-CHECK RO 10/4/2020. PERFORMED NDT ON FS 409.00+128 LBL INTERIOR BULKHEAD POS, REF CRJ 200 AMM NDTM PART 6, 51-20-06. VERIFIED CRACK. REMOVED AND INSTALLED NEW 409+128 LBL 18 POST, REF CRJ 200 SRM DWG REO. COMPLIED WITH TASK CARD. RESTORED FINISH AND PERFORMED PRESSURE LEAK CHECK. LEAK CHECK GOOD.