What was found
FLOOR BEAM CAP CORRODED BETWEEN FS 409 TO FS 409+80 AT RBL 9. C-CHECK RO 10/13/2020. REPLACED FLOOR BEAM CAP BETWEEN FS 409 AND FS 409+80 AT RBL 9, IAW MHIRJ REO. PART FOR PART REPLACEMENT, NO WEIGHT CHANGE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOOR BEAM CAP CORRODED BETWEEN FS 409 TO FS 409+80 AT RBL 9. C-CHECK RO 10/13/2020. REPLACED FLOOR BEAM CAP BETWEEN FS 409 AND FS 409+80 AT RBL 9, IAW MHIRJ REO. PART FOR PART REPLACEMENT, NO WEIGHT CHANGE.