What was found
LH MLG TRUNNION FASTENER HOLES AS FOLLOWS EACH HAS INDICATIONS ,1" LONG AND 45% FSH IN LOCATION #4, AND 65% FSH IN LOCATIONS #8, & #13. FAILED NDT INSPECTION. (REFERENCE NDT REPORT & ATTACHMENTS FOR LOCATION). (C-CHECK RO 4/1/2021) REPAIRED LEFT HAND TRUNNION FASTENER HOLE LOCATIONS #8,#15 AND #19 IAW MHIRJ REO 601R-57-21-3427. FORM 337 AND MAJOR REPAIR TASKCARD 51-900-1003-SKY COMPLETED AND ATTACHED. NO WEIGHT CHANGE. REFERENCE CONTINUE CARD FOR DETAILS OF WORK PERFORMED.