As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
* RIGHT WING SLAT TRACK CANISTER 1-3 ATTACHING BRACKET IS CRACKED. (C-CHECK RO 6/04/2021) PERFORMED REPAIR ON SLAT CANISTER NO 3, SLAT TRACK 1-3 RHS. COMPLIED WITH ALL STEPS OF REO 670-57-42-577 REV-- DATED: 2016-12-02 / LEAK CHECK GOOD. COMPLIED WITH TASK CARD 51-900-1002-SKY.