What was found
FS280 SKIN JOINT SPLICE CORRODED BETWEEN STR 20R & 22R. (C-CHECK RO 10/9/2021) COMPLIED WITH MHIRJ REPAIR ENGINEERING ORDER#670-53-21-2092 FASTENERS REMOVED 3 AREAS BLENDED AT FS280.00 SKIN JOINT SPLICE BETWEEN STR20R AND STR22R ALL FASTENERS REINSTALLED. SEE CAMP # 23165335 FOR PRESSURAZATION CHECK.SEE ATTACHED DOCUMENTS AND M-337 FOR DETAILS. ANALYSIS REQUIREMENTS WILL BE COMPLETED WITHIN 12 MONTHS OF REO ISSUE DATE.