What was found
BACKLASH CHECK FAILED ON RH ELEVATOR #3 PCU (C-CHECK RO 11/10/2021) REMOVED R/H ELEVATOR PCU #3 AND INSTALLED SERVICEABLE PCU #3 IAW CRJ700 AMM CHAPTER 27-33-01-000-801-A01 AND CRJ700 AMM CHAPTER 27-33-01-400-801-A01. PERFORMED RIGGING OF THE ELEVATOR POWER-CONTROL-UNITS IAW CRJ700 AMM CHAPTER 27-33-01-820-801-A01. PERFORMED RIGGING OF THE ELEVATOR POWER-CONTROL-UNIT INPUT TORQUE-TUBE-STOPS IAW CRJ700 AMM CHAPTER 27-33-01-820-802-A01. PERFORMED OPERATIONAL TEST OF THE ELEVATOR CONTROL SYSTEM IAW CRJ700 AMM CHAPTER 27-31-00-710-801-A01. RIG CHECKS AND OPS CHECK GOOD.