What was found
WHILE LOCATING L/H PRESSURE BOX @ LBL 18, WE HAVE DISCOVERED A FACTORY PILOT HOLE ON NEW PRESSURE FLOOR AND FLOORBEAM THAT DOES NOT ALIGN WITH EXISTING FACTORY DRILLED HOLE ON A/C. (C-CHECK RO 4/11/2022) COMPLETED REPAIR OF THE MISALIGNED HOLE ON THE L/H PRESSURE BOX AT LBL 18 IAW MHIRJ REO 690-53-41-307 REV A -- DATED 2022-03-30. DTA DUE WITHIN 12 MONTHS FROM 2022-03-30. COMPLIED WITH SKYWEST MAJOR REPAIR TASK CARD 51-900-1002-SKY. NO CHANGE TO WEIGHT AND BALANCE. REFERENCE CONTIMUATION CARD FOR WORK PERFORMED.