What was found
R/H I/B FLAP - FLAP VANE CHAFED AT FLS 56-57 APPROX 1.25 L X .5 WIDE (C-CHECK RO 9/28/2022) REMOVED AND REPLACED RH FLAP VANE LEADING EDGE SKIN BET. FLS 56 AND 57 IAW CRJ 200 / SRM 51-42-13 AND SRM 51-40-11
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R/H I/B FLAP - FLAP VANE CHAFED AT FLS 56-57 APPROX 1.25 L X .5 WIDE (C-CHECK RO 9/28/2022) REMOVED AND REPLACED RH FLAP VANE LEADING EDGE SKIN BET. FLS 56 AND 57 IAW CRJ 200 / SRM 51-42-13 AND SRM 51-40-11