As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RBL9 FLOOR BEAM IS CORRODED BETWEEN TWO LOCATIONS FIRST IS BETWEEN F.S. 409+16 TO 409+32 THE SECOND IS 409 TO F.S. 409+16. (C-CHECK RO 9/28/2022) REPAIRED RBL 9 FLOORBEAM IAW CRJ200 SRM 53-00-43 REPAIR #2. FORM 337 AND MAJOR REPAIR TASK CARD 51-900-1003-SKY COMPLETED AND ATTACHED. NO WEIGHT CHANGE. SEE CONTINUATION CARD FOR DETAILS OF WORK PERFORMED.