What was found
UPPER FRAME SECTOR @ FS235.00 LHS IS CRACKED. (C-CHECK RO 3/28/2023) LOCATED AND DRILLED NEW FRAME SECTION PN CC670-34133-9S PER CRJ 900 SRM 51-40-11-001-001-A01 INSTALLED NEW FRAME SAECTION FS 235.00 L/H PER CRJ 900 SRM 51-42-06-001-001-A01 CRJ 900 SRM 51-42-21-001-001-A01 AND INSTALLATION DWG KCC670 -34403 REV --. COMPLIED WITH SKYCARD 51-900-1002-SKY. SEE CONTINUE CARD FOR DETAILS.