What was found
* CREW ESCAPE HATCH SURROUND STRUCTURE, ALL 4 STOP FITTINGS ARE CHAFED. (C-CHECK RO 6/19/2024) REPAIRED CREW ESCAPE HATCH 4 EA. STOP FITTINGS AS PER REO 670-53-11-1973 REV -- DATED 2024-06-11 STEPS 1 TO 5. ENSURED BLENDING IN EACH AREA WAS PERFORMED TO SMOOTH CONTOUR, ENSURED COMPLETE REMOVAL OF DAMAGE, ENSURED MAXIMUM BLEND DEPTH IS NOT GREATER THAN REPORTED; NDT PERFORMED ON STEP 2 OF CORRECTIVE ACTION (NO DEFEECTS NOTED); RESTORED FINISH REWORKED AREAS; OMITTED PRIMER AND TOP COAT TO DIA 0.375" AS SHOWN ON FIG 6; REINSTALLED THE CREW ESCAPE HATCH AND PERFORMED OPERATIONAL TEST GOOD AND FUNCTIONAL TEST GOOD PER AMM (ENSURED PROPER FUNCTION OF THE DOOR). M-337 AND SKYWEST TASK CARD 51-900-1002-SKY COMPLIED WITH