Service difficulty report · Control Unit · Cndair CL6002B19

Difficulty date
July 26, 2025
Submitted
July 28, 2025
Operation
Air carrier
Aircraft
N975SW
Make and model
Cndair CL6002B19
Aircraft serial
7951
Aircraft time
46,658 hours, 40,507 cycles
Part
Control Unit
Part number
20035008067
Part serial
A1824
Condition
Warning Message
Part time
33,581 hours, 28,870 cycles
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PLEASE T/S ANTI-ICE DUCT WARNING EVENT AT NEXT MX VISIT. RECOMMEND CHECKING THE LOOPS ON THE LEFT SYSTEMMCI TYPE: TROUBLESHOOTING PRIORITY 1 (FLIGHT 5139 - FILED CLOSED)JUL 26, 2025 STATION: DEN--TROUBLESHOT ANTI-ICE DUCT MSG REFERENCING FIM 36-20-00. PERFORMED OPERATION TEST OF THE BLEED-AIR LEAK DETECTION AND WARNING SYSTEM REFERENCING AMM 36-21-00. OPS CHECK GOOD. PERFORMED OPERATIONAL TEST OF THE WING ANTI-ICE SYSTEM REFERENCING AMM 30-12-00. OPS CHECK GOOD. COULD NOT DUPLICATE FAULT. REMOVED AND REPLACED BLEED LEAK CONTROL UNIT REFERENCING AMM 36-21-10. OPS CHECK GOOD. JUL 27, 2025 STATION: COS -- SEE CP 30557068 FOR ALL T/S AND CORRECTIVE ACTIONS..."T/S ANTI-ICE DUCT WARNING WITH WING SYNOPTIC SHOWN RED PER FIM 36-20-00, SEE CP 30557729(LOOSE TERMINAL BLOCK FOR OVERHEAT SWITCH) AND CP 30557735(BONDING JUMPER NEAR TERMINAL LUG FOR OVERHEAT SWITCH WIRING) FOR CORRECTION OF LH WING BLEED DETECTION DISCREPANCIES. PERFORMED HEALTH CHECK OF LH 14TH STAGE BLEED DETECTION PER FIM 36-20-00, LH FUSELAGE CIRCUIT FAILED AT 1457 OHMS. ISOLATED FAULT TO LOOP A15WK. R&R LH FUSELAGE BLEED LOOP A15WK REF AMM 36-21-04, OPS CHECK GOOD. PERFORMED OPS CHECK OF BLEED AIR LEAK CONTRO