What was found
RIGHT FS 280 TRANSVERSE BEAM CORRODED. JOB COMPLETE. CUT AND REMOVED RIGHT FS 280 BEAM, INTERCOSTALS AT RBL 9.0 AND 27.0 (FOM), PULLEY BRACKET, AND T-BRACKET PER CRJ 700 SRM 51-42-06. FABRICATED T-BRACKET NR 5 FOR RIGHT TRANSVERSE BEAM PER IS 670531100026. FABRICATED U-CHANNEL 7075T6, .063 DRILLED UP AND FINAL SIZE ALL HOLES IN U-CHANNEL AND TRANSVERSE BEAM ALL WORK PER REO670-53-11-00026 READY TO BE INSTALLED. STRESS RELIEVED TITANIUM DOUBLERS FOR RIGHT TRANSVERSE BEAM PER CRJ 700 SRM 51-24-28. INSTALLED FIELD FASTENERS IN TITANIUM DOUBLERS AND INSTALLED CHERRY MAX FASTENERS IN OUTBOARD CORNER UNDER FLOOR SILL PER REO 670-53-11-052. FINISH INSTALLING SOLID RIVETS AND INSTALLED DRIP PAN AND PULLEY BRACKE