Service difficulty report · Flap System · Aerosp ATR72

Difficulty date
October 19, 2007
Submitted
October 23, 2007
Operation
Air carrier
Aircraft
N633AS
Make and model
Aerosp ATR72
Aircraft serial
344
Aircraft time
31,128 hours, 34,655 cycles
Part
Flap System
Condition
Malfunctioned
Location
Te Flaps
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLAP ASYM AFTER TAKEOFF. A/C RETURNED TO ATL AFTER T/O. EMERGENCY DECLARED.