What was found
FS 280 FRAME UPPER AFT ANGLE CRACKED AT RBL 12.0. JOB COMPLETE. STARTED REMOVING FS 280 UPPER ANGLE AT RBL 12.0 PER CRJ 200 SRM 51-42-20. REPAIRED J-ANGLE ON THE PILOT`S BULKHEAD AT FS 280.0 RT BL 9.0 IAW EO 600-53-0091. PERFORMED ET INSPECTION OF CUT LINES AT FS 280 IAW REO 601R-53-11-136 PER CRJ 200 NDTM 51-20-06. NO DEFECTS NOTED. 4/18/08. FABRICATED -3 AND -4 SPLICE ANGLES OUT OF 7075 -0 .050" BATCH 511928, PO 20040439. HEAT TREATED -3 & -4 SPLICE ANGLES TO +62 CONDITION AS PER CRJ 200 SRM 51-24-06 IAW REO 601R-53-11-136. HARDNESS TEST GOOD. FINAL TRIMMED, DRILLED, AND FINISHED -3, -4, AND -1 REPAIR PARTS IAW REO 601R-53-11-136. OK TO INSTALL. INSTALLED ALL 280 REPAIR PARTS INCLUDING RBL 9 INBOARD AND OUTBOARD CLIPS. FINISHED SURFACE AND APPLIED CIC. REINSTALLED DRIP TRAY. WORK DONE IAW REO 601R-53-11-136. JOB COMPLETE. SUPPLEMENTAL SDR CLOSED 4/21/08.