What was found
DISCREPANCIES FOUND DURING C AND CP1 VISIT, FORWARD CARGO DOOR FRAME BEAR STRAP INNER SURFACE CORRODED. BLENDED OUT CORROSION. CONFIRMED ALL CORROSION REMOVED BY FPI. FLAP PEEN REWORKED AREA. FILLED BLEND VOIDS WITH BMS 5-95 SEALANT TO RESTORE ORIGINAL CONTOUR. FABRICATED AND INSTALLED REPAIR DOUBLER FROM .063 2024T3. FABRICATED AND INSTALLED A REPAIR FILLER FROM .071 2024T3. BOEING 8110-3 APPROVAL. (M)