What was found
DURING CHECK-C MAINT, THE NUMBER 8 L/E SLAT, I/B END T/E WEDGE REPAIR I/B EDGE HAD DELAMINATED. RE-BONDED EDGES ON SLAT PER SRM 51-70-03, PAGE 27 TO 48.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CHECK-C MAINT, THE NUMBER 8 L/E SLAT, I/B END T/E WEDGE REPAIR I/B EDGE HAD DELAMINATED. RE-BONDED EDGES ON SLAT PER SRM 51-70-03, PAGE 27 TO 48.