What was found
DURING OP 15 MAINT CHECK, ON THE RT FUSELAGE, SEVERAL RIVET HEADS PULLED THROUGH SKIN AT STA 110, RLR 29. DRILLED OUT 4 COUNTER SUNK RIVETS THAT PULLED THROUGH SKIN. INSTALLED NEW FASTENERS PER SRM 51-30-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OP 15 MAINT CHECK, ON THE RT FUSELAGE, SEVERAL RIVET HEADS PULLED THROUGH SKIN AT STA 110, RLR 29. DRILLED OUT 4 COUNTER SUNK RIVETS THAT PULLED THROUGH SKIN. INSTALLED NEW FASTENERS PER SRM 51-30-2.