As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING NR 2 ENG CHECK FOUND NR 3 BEARING HEAT SHIELD WEDGED BETWEEN THE OIL TANK AND THE MAIN OIL LINE. THE HEAT SHIELD HAS WORN 2 GROOVES IN THE OIL LINE. THE DAMAGE TO THE LINE IS AT LEAST .030. REPLACED NR 2 ENG OIL SCAVENGE LINE. OP CHECKED OKAY ON ENG RUN, NO LEAKS, NO FAULTS. LINE & PARTS ROUTED TO SFOEP. NR 2 ENG NR 3 BEARING LINE HEAT SHIELD WAS ALSO REPLACED & SECURED.