What was found
ON ARRIVAL FOUND WING ANTI ICE BLOW OUT PNL DISINTEGRATED AT THE LT WING STA 523AT. FURTHER T-S SHOWED COMPOSITE DUCT RUPTURED AT STA 523 AT JOINING METAL DUCT. REPLACED TAI DUCT. DISCONNECTED AND RECONNECTED SLAT CONTROL ROD AT BOTH ENDS OF SLAT NR 4. ACCOMPLISHED RII INSPECTION PER METHOD 1 ON INSTALLATION AND OPERATION OF SLAT NR 4, ALL OPS AND IND NORMAL. RECONNECTED AND LEAK CHECKED WING ANTI ICE DUCTS (INTERSTITIAL DUCTS). OK FOR SVC.