What was found
CAPT AIRSPEED SPLIT. NEED TO ACCOMPLISH TEST OF PHC 1,2,3 AND ADR 1,2,3 IN CFDS. ALSO ACCOMPLISH VISUAL CHECK OF CAPTS PITOT TUBE. ALSO CHECK FOR EVIDENCE OF WATER IN SYS. ACCOMPLISHED TEST OF ADR'S AND PH C'S THROUGH THE CFDS-NO FAULTS FOUND. ACCOMPLISHED VISUAL INSP OF PITOT TUBE, NO DAMAGE FOUND OR EVIDENCE OF WATER IN SYS. ACP T/S IAW TSM. REMOVED CAPT'S PITOT TUBE & FOUND INSECT LODGED IN PITOT WITH WATER TRAPPED BETWEEN PROBE 9DA1 & ADM L. CLEANED OUT PROBE & LINE, REPLACE ADM L (19FP1) IAW MM. TESTS PASSED, NO FAULTS NOTED.