What was found
FOUND NOSE STRUT FLAT ON WALK AROUND. SERVICED WITH NITRO. TO BE RECHECKED WITHIN 4 TO 7 DAYS. SERVICED NOSE STRUT PER AMM. NOW NEED TO BE RECHECKED 4-7 DAYS. TIME CHANGED TO 22AUG PER SAMC CONTROLLER. REMOVED NLG STRUT INNER CYLINDER AND REPACK SHOCK ABSORBER PER MM. ACCOMPLISHED NLG SHOCK ABSORBER REPACK PER MM. SYSTEM INFLATE TO 275 PSI 1710. NEED TO CONTINUE FROM ITM G.(2) TO END. COMPLETED INSTALLATION FROM 32-21-13 STEP G TO END. DO AN OPERATIONAL CHECK OF NOSE LDG DUE TO STRUT REPACK. FUNCTIONAL TEST OF NLG NORMAL EXTENSION AND RETRACTION PER MM. INDICATION AND OPS CHECK NORMAL.