As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DOOR 1LT CREASE BEAM SPLASH GUARD REPAIR MUST RECEIVE A NEW 8100-9 SHOWING COMPLIANCE TO 14 CFR 25.571 & 26.43(D) AND THE DAMAGE TOLERANCE INFORMATION INCORPORATED IN THE AIRCRAFT MAINT PROGRAM WITHIN 24 MONTHS FROM 15FEB2012 FOR THE REPAIR APPROVAL TO REMAIN VALID AFTER 15FEB2014.