What was found
NR 1 GENERATOR FIELD TRIPPED CAUSING NR 2 GENERATOR TO TRIP ALSO. CHECKED EACH GENERATOR FREQUENCY AND VOLTS NR 2 OK. RETURNED TO NORMAL OPERATION WITH NR 3. NR 1 FREQUENCY WAS OVER 8000 THEN TRIPPED AGAIN. NR 1 CSD DISCONNECTED BY CHECKLIST PROCEDURES. REMOVED AND REPLACED NR 1 CSD IAW MM 24-11-01. OPERATION CHECK NORMAL NO LEAKS FOUND IAW MM 24-20-00. REMOVED AND REPLACED NR 1 GCU OPERATION CHECK NORMAL IAW MM 24-20-00. REMOVED AND REPLACED NR 2 GCU OPERATION CHECK NORMAL IAW MM 24-20-00. (M)