What was found
REPLACEMENT OF NR 2R DOOR ASSIST BOTTLE REQUIRED DUE BOTTLE DID NOT BLOW IN SLIDE DEPLOYMENT EXERCISE. DOOR NR 2R ASSIST BOTTLE REPLACED PER MM 52-11-06-404-015. RIG OPERATION OF DOOR ASSIST BOTTLE ALSO ACCOMPLISHED PER MM 52-11-06.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
REPLACEMENT OF NR 2R DOOR ASSIST BOTTLE REQUIRED DUE BOTTLE DID NOT BLOW IN SLIDE DEPLOYMENT EXERCISE. DOOR NR 2R ASSIST BOTTLE REPLACED PER MM 52-11-06-404-015. RIG OPERATION OF DOOR ASSIST BOTTLE ALSO ACCOMPLISHED PER MM 52-11-06.