What was found
FORWARD EQUIPMENT COOLING, EICAS MESSAGE. QRH COMPLIED WITH. OCCURRED DURING TAKEOFF, FWD EQ SUP FLOW, MX MESSAGE. ACCOMPLISHED OPERATIONAL TEST OF FWD EQUIP COOLING SYS IAW AMM 21-58-00 501 CONFIG 6, NO FAULTS. ALL INDICATIONS NORMAL & VALVE FAN OPERATES NORMAL.