What was found
WIRES RUBBING ON RT ENG INBD SIDE. REMOVED AND REPLACED THE WIRE IAW SWPM 20-10-11 AND SWPM 26-11-21. OPS CHECKED GOOD IAW AMM 26-11-00.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WIRES RUBBING ON RT ENG INBD SIDE. REMOVED AND REPLACED THE WIRE IAW SWPM 20-10-11 AND SWPM 26-11-21. OPS CHECKED GOOD IAW AMM 26-11-00.