What was found
"R PACK TEMP" EICAS MESSAGE DISPLAYED ACCOMPLISHED QRH(<P>REMOVED & REPLACED PACK TEMP CONTROL VALVE AND OPS CHECK IAW MM 21-51-12.</P>)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
"R PACK TEMP" EICAS MESSAGE DISPLAYED ACCOMPLISHED QRH(<P>REMOVED & REPLACED PACK TEMP CONTROL VALVE AND OPS CHECK IAW MM 21-51-12.</P>)