What was found
C11/SY6 CHECK - EXFOLIATION CORROSION ON FLOORBEAM ASSEMBLY BETWEEN FR64 TO FR67 +10 INCHES, -Y765. REPLACED FLOORBEAM ASSEMBLY BETWEEN FR64 TO FR67 +10 INCHES, -Y765 IAW A319 SRM 51-42-11 PARAGRAPH 5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
C11/SY6 CHECK - EXFOLIATION CORROSION ON FLOORBEAM ASSEMBLY BETWEEN FR64 TO FR67 +10 INCHES, -Y765. REPLACED FLOORBEAM ASSEMBLY BETWEEN FR64 TO FR67 +10 INCHES, -Y765 IAW A319 SRM 51-42-11 PARAGRAPH 5.