What was found
PIT - DURING SCHEDULED SIP INSPECTION REF 53-10-05, FOUND .5 INCH CRACK CENTER LINE BEAM VI FORWARD PRESSURE BULKHEAD. STOP DRILLED CRACK ENDS AND INSTALLED TWO ANGLE DOUBLERS PER USAIR EA 30058. (W)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING SCHEDULED SIP INSPECTION REF 53-10-05, FOUND .5 INCH CRACK CENTER LINE BEAM VI FORWARD PRESSURE BULKHEAD. STOP DRILLED CRACK ENDS AND INSTALLED TWO ANGLE DOUBLERS PER USAIR EA 30058. (W)