What was found
TASK 55-10-01-290, "HORIZONTAL STABILIZER RIB LOCATION BORESCOPE INSPECTION", CRACKS WERE FOUND TO THE RIBS. LT HORIZONTAL STAB RIBS, FS 521.084, SS18.60 HAS 2 CRACK, FS 521.084, SS 37.20 HAS 2 CRACKS, FS 521.084, SS 47.96 HAS 2 CRACKS & FS 521.084, SS 58.75 HAS 1 CRACK AND FS 533.493, SS 47.96 HAS 2 CRACKS. RT HORIZONTAL STAB RIBS, FS 521.084, SS 37.20 HAS 2 CRACKS, FS 521.084, SS 47.96 HAS 2 CRACKS & FS 533.493, SS 47.96 HAS 2 CRACKS.