Service difficulty report · Torque Tube · Cndair CL6002D24

Difficulty date
March 14, 2022
Submitted
March 18, 2022
Operation
Air carrier
Aircraft
N578NN
Make and model
Cndair CL6002D24
Aircraft serial
15381
Aircraft time
14,671 hours, 13,170 cycles
Part
Torque Tube
Condition
Disconnected
Stage of operation
AP
How discovered
O
Nature of condition
F
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLAPS FAILED AT 15000 FT ON APPROACH. EMERGENCY DECLARED. DID NOT LAND OVERWEIGHT. DID NOT BRACE. LANDING SUCCESSFUL WITHOUT ISSUES. NO FURTHER INFORMATION / ONCE THE FLAP TORQUE TUBES WERE EXPOSED WE FOUND THAT THE TORQUE TUBE AT WS231.00-WS264.00 ON THE LH SIDE WAS NOT CONNECTED TO THE ANGLE GEARBOX. INSTALLED THE 3 LH OUTERMOST TORQUE TUBES IAW CRJ 900 AMM 27-52-01-400-806/807/808/809. PERFORMED MECHANICAL OPERATION OF THE FLAPS WITH BPSU CONNECTED IAW CRJ 900 AMM 27-52-00-864-803. PERFORMED THE ELECTRICAL RIGGING OF THE FLAPS SYSTEM IAW CRJ 900 AMM 27-52-00-820-802. OPS CHECK GOOD.