What was found
MHV - DURING AIRCRAFT SCHEDULED INSPECTON AT REPAIR STATION, LEVEL 1 SURFACE CORROSION DETECTED AT THREE PLACES IN AFT RIGHT LAV FLOOR SUPPORT FRAME, STATIONS 786 TO 826, RBL PLUS/MINUS 16. REMOVED CORRODED PARTS FROM FLOOR SUPPORT FRAME. FABRICATED 2 'L' MEMBERS AND 2 FILLERS AND 1 DOUBLER PER DC-9 SRM 51-10-02 AND 53-01 FIG 2 ALODINED, PRIMERED AND FABRICATED PER DC-9 SRM 51-10-3. INSTALLED FABRICATED REPAIR PARTS PER DC-9 SRM 51-30-02. (M)