What was found
DURING HEAVY MAINTENANCE, INITIAL INSPECTION CPCP FINDING: CORROSION ON SHEAR PANEL, LOCATED BTW -Y=950 AND FR87 - FR88 AT PASSENGER FLOOR INTERNAL STRUCTURE (W2); CMOR: REPLACE PER EMB190 SRM 51-42-01, SRM 51-42-02 AND SRM 51-43-03. WORK ACCOMPLISHED ON TECHOPS W/O N328JB/1965/ E190/B5 CHECK NRC:00256 TECH: 201959847 - RESENDIZ MARTINEZ, ENRIQUE 15/JUN/22 INSP: 201740577 - TRUJILLO CASTAÑEDA, RUTH ANDREA 16/JUN/22 (CONSIDERED AS A MAJOR REPAIR)