What was found
DURING HEAVY MAINTENANCE: FUSELAGE / CENTER FUSELAGE III / STGR 27R / FR 85 TO 87 / CORROSION. PERMANENT REPAIR. (CONSIDERED AS A MAJOR REPAIR)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY MAINTENANCE: FUSELAGE / CENTER FUSELAGE III / STGR 27R / FR 85 TO 87 / CORROSION. PERMANENT REPAIR. (CONSIDERED AS A MAJOR REPAIR)