What was found
DURING HEAVY MAINTENANCE: CORROSION IN SHEAR CLIP LOCATED IN FR88 BETWEEN STRG 27R/28R AT CF III INTERNAL STRUCTURE; (RESOLVED ON W/O: 1214269 TASKCARD: NR-00018 ) CORROSION IN SHEAR CLIP LOCATED IN FR 88 BETWEEN STRG 27R/28R AT CF III INTERNAL STRUCTURE WAS REMOVED PER EMB 190 SRM 51-12-01, SRM 51-10-03; WAS EVALUATED OUT OF LIMITS PER EMB 190 SRM 51-75-16 AND WAS REPLACED PER EMB 190 SRM 51-43-03 AND SRM 51-41-02. ALL WORK ACCOMPLISHED ON TOMX WO #2222, N/R # 00078. ACCOMPLISHED BY TOMX TECH # 10000939, RII BY TOMX QC # 10001841.