Service difficulty report · Fuel Nozzle · Cessna 510

Difficulty date
September 8, 2008
Submitted
April 30, 2009
Operation
Air carrier
Aircraft
N75ES
Make and model
Cessna 510
Aircraft serial
5100024
Aircraft time
378 hours, 375 cycles
Engine
Pwc PW615FA
Engine time
378 hours, 375 cycles
Part
Fuel Nozzle
Part number
35C242401
Part serial
1AMR2364
Condition
Overtorqued
Location
Rt Engine
Part time
402 hours, 397 cycles
Stage of operation
TX
How discovered
O
Nature of condition
W, B
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING START UP, CREW NOTICED AND REPORTED WHITE SMOKE AND A SLOW START FROM THE RT ENGINE. WHEN THE ENGINE WAS SHUTDOWN AND RESTARTED, THE CONDITION COULD NOT BE DUPLICATED. SEVERAL DAYS LATER, THE SAME CONDITION OCCURRED. THE TECH WAS NOTIFIED (9/8/08) AND RECOMMENDED REPLACING THE HMU. THE AIRCRAFT WAS RETURNED TO SERVICE. OVER THE NEXT FEW WEEKS, IT WAS DISCOVERED THAT THIS EVENT OCCURRED ONLY ON THE FIRST START UP OF THE DAY. IGNITER BOXES AND IGNITERS WERE SWAPPED ALL AT THE RECOMMENDATION OF THE TECH REP. THE ISSUE CONTINUED AND ULTIMATELY THE ENGINE WAS REMOVED TO BE TORN DOWN ON 10/28/08. MFG DETERMINED THAT THE CAUSE OF THE WHITE SMOKE WAS A TIGHT NOZZLE SPRAY. THE ENGINE WAS REPAIRED AND REINSTALLED ON 02/06/09 AND HAS HAD NO DEFECTS SINCE.

More about the Cessna 510