Service difficulty reports

1,773,593 reports of malfunctions and defects, newest first. Air carriers must report; general aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR AALA202507259901Window Post · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK INDICATION FOUND ON UPPER RADIUS OF WINDSHIELD CENTER POST LOWER ATTACHMENT AREA INTERNAL SIDE LH. CRACK L= 0.160 INCH. MAINTENANCE PERFORMED TIME LIMITED REPAIR LOC WINDSHIELD CENTER POST LOWER ATTACHMENT AREA INTERNAL FRAMApr 16, 2025 · N819AW · Airbus A319132 · Fuselage Main, StructureSDR AALA202507218300Attach Fitting · excess playAIRCRAFT IN BASE MAINTENANCE: REPLACE RH LOWER LATERAL FITTING OF THE ELECTRONICS RACK FIN 80VU PER EA 364061. MAINTENACNE PERFORMED INTERIM REPAIR LOCATED 80VU AREA RH LOWER LATERAL FITTING IAW EA 364061.Apr 16, 2025 · N819AW · Airbus A319132 · Fuselage Main, Attach FittingsSDR SWIA202507210416Frame · corrodedFRAME FS 1051.30 CORRODED BETWEEN STGR 27 AND STGR 25LH #29987334 (C-CHECK RO 07/18/2025)REPAIRED FRAME AT FS1051.30 BETWEEN STGR 27 AND STGR 25LH IAW REO 670-53-61-2500 REV -- 2025-05-26. COMPLIED WITH ALL STEPS OF REO 670-53-61-2500 REV -- 2025-05-26. COApr 16, 2025 · N723EV · Cndair CL6002C10 · Fuselage Main, FrameSDR SWI2025F00932Stand Off · crackedL/H LWR TRANSCOWL OTBD A BRACKET STANDOFF IS CRACKED. LT LWR TRANSCOWL O/B A BRACKET HAS BEEN REPLACED WITH NEW PART IAW REO 670-54-21-971, REV B. COMPLIED FULLY W/SKYCARD 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Engine Thrust ReverserSDR SWI2025F00931Actuator · damagedNOTCH NOTED IN LT INBD FLAP ACTUATOR COMMON TO ACCESS PANEL 584DB. REMOVED DAMAGE FROM LH INBD FLAP VANE ACTUATOR COMMON TO PANEL 584DB IAW REO 670-57-52-257 REV -A, OPS CHECK GOOD AT THIS TIME. COMPLIED WITH SKYWEST TASK CARD: 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge Flap ActuatorSDR SWI2025F00930Attach Angle · corrodedTHE LT MLG TIRE BURST PANEL 542AZ ATTACHMENT ANGLE IS CORRODED. INSTALLED NEW LT MLG TIRE BURST PANEL 542AZ ATTACHMENT ANGLE REF. DWG CC670-10320, REV -F AND SRM 51-42-21-001-001-A01. COMPLETED SKYWEST TASK CARD 51-900-1002-SKY. LEAK CHECK GOOD.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge FlapsSDR SWI2025F00929Actuator · damagedNOTCH NOTED IN LT INBD FLAP ACTUATOR COMMON TO ACCESS PANEL 584CB. REMOVED DAMAGE FROM LH INBD FLAP VANE ACTUATOR COMMON TO PANEL 584CB IAW REO 670-57-52-257 REV -A, DATED: 2024-08-20. OPS CHECK GOOD AT THIS TIME. COMPLIED WITH SKYWEST TASK CARD: 51-900-1002-Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge Flap ActuatorSDR SWI2025F00928Floorbeam · crackedCOCKPIT FLOOR FRAME RBL 9 CRACKED IN THE RADIUS WHERE THE FRAME ATTACHES TO THE FS 280 BULKHEAD. REMOVED AND INSTALLED NEW COCKPIT FLOORBEAM RBL 9 IAW SRM 53-11-43-201-003-A01. COMPLIED WITH SKYWEST TASK CARD 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Fuselage Main, Floor BeamSDR SWI2025F00927Actuator · damagedNOTCH NOTED IN LT INBD FLAP ACTUATOR COMMON TO ACCESS PANEL 584AB. REMOVED DAMAGE FROM LH INBD FLAP VANE ACTUATOR COMMON TO PANEL 584AB IAW REO 670-57-52-257 REV -A, OPS CHECK GOOD AT THIS TIME. COMPLIED WITH SKYWEST TASK CARD: 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge Flap ActuatorSDR SWI2025F00926Stand Off · crackedLEFT UPPER TRANSCOWL INBD A BRACKET STANDOFF IS CRACKED. INSTALLED A NEW LT UPPER TRANSCOWL INBD A BRACKET REF REO# 670-54-21-971, REV B, COMPLIED FULLY W/SKYCARD 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Engine Thrust ReverserSDR SWI2025F00925Stand Off · crackedLEFT UPPER TRANSCOWL OTBD A BRACKET STANDOFF IS CRACKED. INSTALLED NEW A BRACKET INTO L/H UPPER TRANSCOWL REF REO 670-54-21-971, REV B.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Engine Thrust ReverserSDR SWI2025F00924Stiffener · damagedHORIZONTAL STIFFENER, WL 85, ON THE AFT SIDE OF THE FS 280 BULKHEAD IS DAMAGED ON THE INBD CORNER RBL 9. REPAIRED THE HORIZONTAL STIFFENER IAW REO 690-53-11-2025, REV-. COMPLIED WITH SKY CARD 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Fuselage Miscellaneous StructureSDR SWI2025F00923Doubler · crackedFORWARD EQUIPMENT COMPARTMENT, A CRACK IN THE RADIUS OF THE DOUBLER UNDER THE ADG STOW PUMP ASSY. FS 193.00. REPAIRED THE DOUBLER UNDER THE ADG STOW PUMP ASSY AT FS193.00 BY FABRICATING NEW DOUBLER AND INSTALLING NEW DOUBLER. IAW REO 670-53-11-509 REV -E DATEApr 16, 2025 · N802SK · Cndair CL6002D24 · Fuselage Main, Plate/SkinSDR SWI2025F00922Angle · crackedON THE FORWARD LOWER SIDE OF THE FS280.00 BULKHEAD ANGLE, BL26.00 HAS A CRACK IN THE RADIUS. INSTALLED NEW REPLACEMENT ANGLE AT RBL 26 FRONT SIDE OF FS.280 BULKHEAD UNDER COCKPIT FLOOR PER. CRJ900 SRM TASK 51-42-06-001-001-A01 , SRM TASK 51-42-13-001-001-A01 Apr 16, 2025 · N802SK · Cndair CL6002D24 · Fuselage Miscellaneous StructureSDR SWI2025F00921Actuator · damagedNOTCH NOTED IN L/H INBD FLAP ACTUATOR COMMON TO ACCESS PANEL 584BB. REMOVED DAMAGE FROM LH INBD FLAP VANE ACTUATOR COMMON TO PANEL 584BB IAW REO 670-57-52-257 REV -A, OPS CHECK GOOD AT THIS TIME. COMPLIED WITH SKYWEST TASK CARD: 51-900-1002-SKY.Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge Flap ActuatorSDR SWI2025F00920Actuator · damagedNOTCH NOTED AT R/H INBD FLAP VANE ACUTATOR COMMON TO PANEL 684AB (MARKED) (C-CHECK RO 07/15/2025)REMOVED DAMAGE FROM RH INBD FLAP VANE ACTUATOR COMMON TO PANEL 684AB IAW REO 670-57-52-257 REV -A, DATED: 2024-08-20. OPS CHECK GOOD AT THIS TIME. COMPLIED WITH Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge Flap ActuatorSDR SWI2025F00919Actuator · damagedNOTCH NOTED AT R/H INBD FLAP VANE ACUTATOR COMMON TO PANEL 684CB. REMOVED DAMAGE FROM RH INBD FLAP VANE ACTUATOR COMMON TO PANEL 684CB IAW REO 670-57-52-257 REV -A, DATED: 2024-08-20. OPS CHECK GOOD AT THIS TIME. COMPLIED WITH SKYWEST TASK CARD: 51-900-1002-Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge Flap ActuatorSDR SWIA2025071600416Vane · damagedNOTCH NOTED AT R/H INBD FLAP VANE ACUTATOR COMMON TO PANEL 684BB (MARKED) (C-CHECK RO 07/15/2025)REMOVED DAMAGE FROM RH INBD FLAP VANE ACTUATOR COMMON TO PANEL 684BB IAW REO 670-57-52-257 REV -A, DATED: 2024-08-20. OPS CHECK GOOD AT THIS TIME. COMPLIED WITH Apr 16, 2025 · N802SK · Cndair CL6002D24 · Trailing Edge FlapsSDR AALA202507078655Fitting · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK INDICATION FOUND ON CONTINUITY FITTING ON WINDSHIELD AREA LOWER ATTACHMENT AREA INTERNAL SIDE RH L= 0.200 IN. MAINTENANCE PERFORMED TIME LIMITED REPAIR, REPLACED CONTINUITY FITTING IN WINDSHIELD RH SIDE IAW EA 363987.Apr 16, 2025 · N819AW · Airbus A319132 · Fuselage Main, StructureSDR AALA202507076746Fitting · crackedAIRCRAFT IN BASE MAINTENANCE: CRACK INDICATION FOUND ON CONTINUITY FITTING OF WINDSHIELD AREA LOWER ATTACHMENT AREA INTERNAL SIDE LH L= 0.200 IN. PERFORMED TIME LIMITED REPAIR, REPLACED CONTINUITY FITTING IN WINDSHIELD LH SIDE IAW EA 363987.Apr 16, 2025 · N819AW · Airbus A319132 · Fuselage Main, StructureSDR IPXA2025061837191Door Frame · gougedCREW DOOR, AFT FRAME (FR16.1) MECHANISM LOCK FITTING HAS GOUGE. DOT 103-62 (ATTACHED PHOTO) REMOVED MINOR GOUGE AT LOCK FITTING IAW SRM A300-600 51-73-11 MATERIAL THIKNESS IS 1.100" AND MATERIAL LOSS 0.003 AND REMAINING THIKNESS IS 1.197" THERE IS WHTIN INApr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Main, StructureSDR IPXA2025061837628Lock · damagedCREW DOOR, INNER SURFACE, UPPER SIDE, BRACKET SUPPORT AT AFT LOCK HOLE HAS GOUGE. DOT 103-64 (ATTACHED PHOTO) REMOVED MINOR GAUGE IAW SRM A300-600 51-73-11 MATERIAL LOSS 0.002 WITHIN LIMITS IAW SRM 51-73-11. T988826 C18-C02 OK TO RESTORE SURFACE PROTECTION. APApr 16, 2025 · N125UP · Airbus A300F4622R · Passenger/Crew DoorsSDR AALA202506138660Fitting · burredAIRCRAFT IN BASE MAINTENANCE: BURRED MATERIAL ON LH LOWER LATERAL FITTING OF THE ELECTRONICS RACK FIN 80VU, W=0.485 INCH. MAINTENANCE PERFORMED INTERIM REPAIR LOCATED 80VU AREA LH LOWER LATERAL FITTING IAW EA 364061.Apr 16, 2025 · N819AW · Airbus A319132 · Fuselage Main, StructureSDR AALA202506098403Frame · crackedAIRCRAFT IN BASE MAINTENANCE: CRACKED FRAME AFT FACE AT FR 68 AND S8L. REPAIRED FRAME PER EA 364308.Apr 16, 2025 · N172US · Airbus A321211 · Fuselage Main, FrameSDR IPXA2025052546455Skin · crackedTWO CRACKS FOUND IN HOLE A ON RH FR47 HORIZONTAL JUNCTION. ACCOMPLISH THE REPAIR PER EO-93655-REQ1 REV. 2 AND EA 300-5710-27-A3905 REV. A. CAUTION: THE WORK INSTRUCTIONS CONTAINED WITHIN (OR APPROVED BY) THIS EO CONTAIN RII INSPECTION REQUIREMENTS AND RII BUY Apr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Main, Plate/SkinSDR IPXA2025052546480Skin · crackedCRACK FOUND IN HOLE C ON RH FR47 HORIZONTAL JUNCTION. ACCOMPLISH THE REPAIR PER EO-93655-REQ1 REV. 2 AND EA 300-5710-27-A3905 REV. A. CAUTION: THE WORK INSTRUCTIONS CONTAINED WITHIN (OR APPROVED BY) THIS EO CONTAIN RII INSPECTION REQUIREMENTS AND RII BUY - OFFApr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Main, Plate/SkinSDR IPXA2025052546594Skin · crackedCRACK FOUND IN HOLE S ON RH FR47 HORIZONTAL JUNCTION. ACCOMPLISH THE REPAIR PER EO-93655-REQ1 REV. 2 AND EA 300-5710-27-A3905 REV. A. CAUTION: THE WORK INSTRUCTIONS CONTAINED WITHIN (OR APPROVED BY) THIS EO CONTAIN RII INSPECTION REQUIREMENTS AND RII BUY - OFFApr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Main, FrameSDR IPXA2025052546546Skin · crackedCRACK FOUND IN HOLE E ON RH FR47 HORIZONTAL JUNCTION. ACCOMPLISH THE REPAIR PER EO-93655-REQ1 REV. 2 AND EA 300-5710-27-A3905 REV. A. CAUTION: THE WORK INSTRUCTIONS CONTAINED WITHIN (OR APPROVED BY) THIS EO CONTAIN RII INSPECTION REQUIREMENTS AND RII BUY - OFFApr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Main, FrameSDR IPXA2025052546559Skin · crackedCRACK FOUND IN HOLE G ON RH FR47 HORIZONTAL JUNCTION. ACCOMPLISH THE REPAIR PER EO-93655-REQ1 REV. 2 AND EA 300-5710-27-A3905 REV. A. CAUTION: THE WORK INSTRUCTIONS CONTAINED WITHIN (OR APPROVED BY) THIS EO CONTAIN RII INSPECTION REQUIREMENTS AND RII BUY - OFFApr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Main, FrameSDR SWI2025F00662Support Beam · failed inspENGINE SUPPORT BEAM RBL27.50 CLOSE OUT ANGLE AT FS625.30 & WL111.09 HAS AN INDICATION .75" LONG BY 100% FSH PROPERGATING FROM THE LOWER FASTENER HOLE. FAILED NDT INSPECTION. (C-CHECK RO 05/27/2025)REMOVED UNSERVICEABLE RH ENG SUPPORT BEAM CLOSE OUT ANGLE (P/Apr 16, 2025 · N930SW · Cndair CL6002B19 · Nacelle/Pylon, Main FrameSDR SWIA20250527416Support Beam · failed inspENGINE SUPPORT BEAM LBL27.50 CLOSE OUT ANGLE AT FS625.30 & WL119.12 HAS AN INDICATION .3" LONG BY 100% FSH PROPERGATING FROM THE UPPER FASTENER HOLE. FAILED NDT INSPECTION. (C-CHECK RO 05/27/2025)REMOVED UNSERVICEABLE LH ENG SUPPORT BEAM CLOSE OUT ANGLE (P/N:Apr 16, 2025 · N930SW · Cndair CL6002B19 · Nacelle/Pylon, Main FrameSDR IPXA2025052344612Bracket · crackedLH HORIZONTAL STAB LEADING EDGE APRON SUPPORT BRACKET P/N: A5517155120451 BROKEN. INSTALLATION OF NEW BRACKET P/N: A5517155120451, B/N:0004388210 IAW A300-600F SRM 51-40-21. FASTENERS USED: FOUR HI-LOKS P/N HL10VF6-6, BATCH #0004358134 AND FOUR COLLARS P/N NApr 16, 2025 · N125UP · Airbus A300F4622R · Fuselage Miscellaneous StructureSDR SWAA2025052025719Floor Panel · pulledFLOOR PANEL 231ZF UPPER SKIN HAS AREAS OF PULLED STRANDS. <[01] FLOOR PANEL 231ZF WAS REPLACED IAW SRM 53-00-50-2R-0 PARA 1. A NOTE:; [02] VERIFIED CORRECTIVE ACTION ITEM 1.Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Floor PanelSDR SWAA2025052025720Floor Panel · failedFLOOR PANEL 241AF UPPER SKIN HAS AREAS OF A FAILED PREVIOUS REPAIR. <[01] FLOOR PANEL 241AF WAS REPLACED IAW SRM 53-00-50-2R-0 PARA 1. A NOTE:; [02] VERIFIED CORRECTIVE ACTION ITEM 1.; [03] VERIFIED CORRECTIVE ACTION ITEM 1. JOB COMPLETE.Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Floor PanelSDR SWAA2025052025711Support · corrodedFCB - CORROSION ON SIDEWALL SUPPORT BS 400+10 RBL 23 WL 156.5 (MARKED) <[01]. REMOVED AND REPLACED FLOOR TO SIDEWALL SUPPORT AT FCB FROM BS 400 TO BS420 RBL 23 WL 156.5 IAW SRM 51-40-02 & DWG# 143A7500 REV: -. ID: 0071.Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Miscellaneous StructureSDR SWAA2025052026660Shield · corrodedFCB - CORROSION ON FWD SHIELD BS 420+17 RBL 23 WL 156.5 (MARKED) <[01] REMOVED AND REPLACED FWD SHIELD AT FCB BS420-BS440 RBL23 WL156.5 IAW SRM 51-40-02-0G-0 AND DWG 143A0080.Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Miscellaneous StructureSDR SWAA2025052058295Support · corrodedFCB - CORROSION ON SIDEWALL SUPPORT BS 440+2; BS440+10; BS440+18; BS460+6; BS460+10; BS460+14; BS460+18 LBL 24.5 AND BS440+2 LBL23.5 WL 156.5 (MARKED) <[01]. REMOVED AND REPLACED FLOOR TO SIDEWALL SUPPORT AT FCB BETWEEN BS 396 TO BS 500D RBL 25 WL 156 IAW SRM Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Miscellaneous StructureSDR SWAA2025052025713Floorbeam · crackedFLOOR SUPPORT CROSSBEAMS AT MID CABIN ABOVE FWD SPAR CRACKED - BS 539; LBL 1 AND RBL 1.<[01] REMOVED AND REPLACED 2EA PANEL BREAK. P/N: 143A5240U33 LOT: 1602183-5 AND P/N: 143A5240U34 LOT: 1591872-1 AND 2EA PLATE P/N 143A5240U12 LOT: 1598027-6 AND P/N: 143A524Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Main, Floor BeamSDR SWAA2025052025715Support · corrodedFCB - CORROSION ON SIDEWALL SUPPORT BS 500+10; BS500+14; BS500+18; BS500A+2; BS500A+6; BS500A+10; BS500C+2; BS500C+6; BS500C+10 LBL 24.5 WL 156.5 (MARKED)<[01] THIS FAULT WILL BE ACCOMPLISHED ON CARD TTG8Q00ZWH9X.Apr 16, 2025 · N226WN · Boeing 7377H4 · Fuselage Miscellaneous StructureSDR SWAA2025051956543Seat Track · corrodedCORROSION ON LBL 24 SEAT TRACK WELL AT STA 727C+13 TO 727C+15; 727E+4 TO 727E+6; 807+17 TO 807+19; 827+13 TO 847; 847+7 TO 847+9; 867+9 TO 867+11; WL 208.3<[01] DISCREPANCIES FOUND ON THIS FAULT BEING VOID DUE TO MECHANICAL DAMAGE REPORTED ON TTG8Q00ZWAQK EXCEApr 16, 2025 · N7858A · Boeing 73779P · Fuselage, Seat/Cargo Attach FittingsSDR SWAA2025051956536Panel · debondedPANEL 191CL OUTER SKIN IS DISBONDED NEAR CENTER OF PANEL. (MARKED)<[01] PANEL 191CL WITH OUTER SKIN DISBONDED NEAR CENTER OF PANEL WAS REPAIRED IAW SRM 51-70-05-2R-2.Apr 16, 2025 · N7858A · Boeing 73779P · Aerodynamic FairingsSDR CALA2025051904768Crease Beam · corrodedSUPPORT TASK: L-2 DOOR CREASE BEAM HAS AREAS OF CORROSION. REMOVED AND REPLACED L-2 DOOR CREASE BEAM IAW B737 SRM 51-40-02 AND BOEING DRAWING NO. 147A8540 REV B ESFR COMPLETED REMOVED AND REPLACED L-2 DOOR CREASE BEAM IAW B737 SRM 51-40-02 AND BOEING DRAWING Apr 16, 2025 · N33203 · Boeing 737824 · Fuselage Main, StructureSDR SWAA2025051656558Cargo Track · crackedAFT CARGO BAY CARGO TRACK IS CRACKED BS767 RBL13 WL156<[01] REPAIRED AS PER SRM 53-00-53-2R-3 AND EA 25-153-01016.;[02] VERIFIED CORRECTIVE ACTIONApr 16, 2025 · N7858A · Boeing 73779P · Fuselage, Seat/Cargo Attach FittingsSDR SWAA2025051456818Floorbeam · corrodedCORROSION ON BS986 FLOOR BEAM AT NUTPLATE HOLES AT RBL 27.5; RBL31.5; RBL35.5 AND RBL 43 WL208.1<[01] REPAIRED PASSENGER CABIN FLOOR BEAM BS 986 IAW SRM 53-70-51-2R-4 REPAIR-4;[02] COMPLETE;[03] VERIFY JOB COMPLETE;[04] COMPLETEApr 16, 2025 · N293WN · Boeing 7377H4 · Fuselage Main, Floor BeamSDR SWAA2025051441158Vapor Barrier · crackedR/H VAPOR BARRIER CRACKED AT BS 663<[01] R/H VAPOR BARRIER CRACK AT BS 663 WAS REPAIRED IAW SRM 51-70-04-2R-10;[02] VERIFIED CORRECTIVE ACTION ITEM 1.Apr 16, 2025 · N293WN · Boeing 7377H4 · Fuselage Main, BulkheadSDR SWAA2025051441159Vapor Barrier · crackedL/H VAPOR BARRIER CRACKED AT BS 663<[01] L/H VAPOR BARRIER CRACK AT BS663 WAS REPAIRED IAW SRM 51-70-04-2R-10.;[02] VERIFIED CORRECTIVE ACTION ITEM 1.Apr 16, 2025 · N293WN · Boeing 7377H4 · Fuselage Main, BulkheadSDR SWAA2025051456819Seal · crackedRT. HORIZONTAL STAB FWD UPPER SLIDE SEAL CRACKED.<[01] REMOVED AND REPLACED RT. HORIZONTAL STAB FWD UPPER SLIDE SEAL IAW AMM 53-31-31-000-802 AND AMM 53-31-31-400-802.<BR>USED TOOL: SCREW GUN<BR>ID: PER2472<BR>CAL DUE: 08/2025;[02] VERIFIED COMPLETION ACTION 1Apr 16, 2025 · N293WN · Boeing 7377H4 · Horizontal Stabilizer Miscellaneous StructureSDR REXA2025051400588Lug · crackedLH AFT EMERGENCY EXIT AFT LUG APPEARS TO BE CRACKED COMPLIED WITH ENDEAVOR EA CRJ952-19166 REV IR 4/30/2025. SEE ATTACHED DTA NRI 933425 FOR DETAILS.Apr 16, 2025 · N182GJ · Cndair CL6002D24 · Emergency ExitsSDR REXA2025050800568Floorbeam · corroded"FOUND CORROSION UNDER SEAT TRACK ON LBL9 FLOOR BEAM BETWEEN FS 1000 AND 1060. FOUND CORROSION UNDER SEAT TRACK ON LBL9 FLOOR BEAM BETWEEN FS 1000 AND 1060. BLENDED CORROSION ON LBL9 FLOOR BEAM BETWEEN FS 1000 AND 1060 IAW CRJ700 SRM 51-21-06-001-001-A01. C/W Apr 16, 2025 · N379CA · Cndair CL6002C10 · Fuselage, Seat/Cargo Attach FittingsSDR IPXA2025050643072Skin · corrodedCORROSION FOUND APPROX 18 INCHES FWD OF CENTER WING BOX AND APPROX AT RBL 88. 49-036 ATA 53-00 CENTER WING TANK UPPER FWD SKIN BETWEEN STA XCW=-74 TO XSW=-111 AND BETWEEN S-16 AND S-21 LOCATION CORROSION REWORK ACCOMPLISHED PER VT SAA E.A.#011-5730-01-B0472 RApr 16, 2025 · N260UP · Doug MD11F · Fuselage Main, Plate/Skin