Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '030ac7afef76a1e5cb89e319ada0446ec33b39aee0490ae13e87c92cd167e47f' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '030ac7afef76a1e5cb89e319ada0446ec33b39aee0490ae13e87c92cd167e47f' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
S.B. BAe146 201-25-23
HIGHLIGHTS To: Holders of BAe 146 Evacuation Slide/Raft System Service Bulletin BAe 146 201-25-23 Title: Equipment/Furnishings-Emergency Equipment BAe 146 Evacuation Slide/Raft System Fusible Plug Recall Effectivity: Evacuation Slide System P/Ns D30543-109, -110, -111, -112, -113, -114, -115, and -116 Reservoir and Valve Assembly D31811-103 Inflation Valve D18306-101, serial numbers listed herein.
To recall Fusible Plugs LOT PA-21 and PA-22 installed in inflation valves and inflation systems in service. Fusible Plugs are safety devices which safely vent the pressure from charged inflation systems in the event the inflation systems are subjected to excessive temperatures. Two incidents have been reported from the field where fusible plugs manufactured from the suspect lots have activated below their rated temperature of 174 degrees Fahrenheit. Testing conducted on fusible plug from suspect lots indicate that the plugs activate (vent gas) between the temperature range of 130 to 150 degrees Fahrenheit. Activation of the fusible plugs will vent all gas from the inflation system reservoir rendering the slide/raft unusable.
Comments regarding this Service Bulletin, including those of an editorial nature, should be e-mailed to: technicalpublications@zodiacaerospace.com
No text on this page: it may be a figure. Open the PDF to see it.
S.B. BAe 146 201-25-23 Page 1 of 7 ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
EQUIPMENT FURNISHINGS -EMERGENCY EQUIPMENT BAe SLIDE/RAFT EVACUATION SYSTEMS
FUSIBLE PLUG RECALL
1. Planning Information A. Effectivity BAe 146 Evacuation Slide/Raft System D30543-109, -110, -111, -112, -113, -114, -115, and -116 Reservoir and Valve Assembly D31811-103 Inflation Valve D18306-101 Inflation valves shipped as spares: S/N R08-008114, R0-008116, R08- 008117, R08-009574, R09-512374, R09-512375, and R09-514690.
NOTE: Fusible Plugs, P/N B13984-3, Lot PA-21 or PA-22, shipped from Air Cruisers Company approximate dates of Oct 1, 2008 through Oct 1, 2009.
Fusible plugs shipped as spares could potentially be installed on systems, reservoir and valve assemblies and inflation valves listed above.
B. Reason To recall Fusible Plugs LOT PA-21 and PA-22 installed in inflation valves and inflation systems in service. Fusible Plugs are safety devices which safely vent the pressure from charged inflation systems in the event the inflation systems are subjected to excessive temperatures. Two incidents have been reported from the field where fusible plugs manufactured from the suspect lots have activated below their rated temperature of 174 degrees Fahrenheit. Testing conducted on fusible plug from suspect lots indicate that the plugs activate (vent gas) between the temperature range of 130 to 150 degrees Fahrenheit. Activation of the fusible plugs will vent all gas from the inflation system reservoir rendering the slide/raft unusable.
C. Compliance It is recommended that this modification be accomplished at the next access to the equipment.
S.B. BAe 146 201-25-23 Page 2 of 7 ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN D. Description NOTE: Only those organizations authorized by the FAA or other airworthiness authorities are permitted to perform this modification.
Operators are to check all fusible plugs, B13984-3. Any fusible plug stamped with lot number PA-21 or PA-22 are to be scrapped. Check evacuation system, reservoir and valve assemblies and valves in spares for fusible plugs with the above stated lot numbers. Plugs with suspect lot numbers shall be replaced with new plugs following instructions detailed in the applicable Component Maintenance Manual (CMM). Re-identify with marking called out in accomplishment instructions.
E. Approval Certification, TSO-C69a This service bulletin contains modification information which has been submitted to the FAA under the TSO-C69a authorization for the affected articles.
F . Labor Hours It will take approximately 0.25 hour per system to accomplish the instructions outlined in this service bulletin.
G. Material - Cost and Availability
(1). EDR (Engineering Data Release) Kit referenced in Paragraph 3, is available at free of charge, 60 days upon receipt of a no charge purchase order which lists the part number and serial number of the system and/or valve. The free of charge condition, and availability, will be in effect for three years after original issue date of the service bulletin, thereafter price and availability upon request.
(2). EDR Kit is available from your local authorized Zodiac Services distributor. Please contact Zodiac Service Europe, Cage Code FAUX0; Zodiac Aerospace UK, Cage Code U03Z8; Zodiac Services Americas, Cage Code 567V9; In-Services Middle East, Cage Code SFB76 or Zodiac Services Asia, Cage Code QC054.
H. Tooling - None.
I. Weight and Balance - None.
J. Electrical Load Data - Not affected.
S.B. BAe 146 201-25-23 Page 3 of 7 ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN K. References Air Cruisers Company Service Information Letter (SIL) 25-246.
L. Other Publication Affected Air Cruisers Component Maintenance Manual (CMM) 25-65-16 will have to be updated to reflect this service bulletin.
M. Family Tree Charts of Modification Relationships- None.
2. Accomplishment Instructions WARNING: REPLACEMENT OF THE FUSIBLE PLUG SHALL NOT BE
PERFORMED WITH THE RESERVOIR UNDER PRESSURE (CHARGED).
A. Inspect all inflation valves and reservoir and valve assemblies in service.
(1). Inspect all valves, D18306-101, for fusible plugs lot number PA-21 or PA-22.
(2). Inspect all reservoir and valve inflation assemblies, D31811-103 for fusible plugs lot number PA-21 or PA-22.
(3). If fusible plug, B13984-3, has a lot number PA-21 or PA-22 remove, discard, and replace with new fusible plug and O-Ring from EDR Kit, reference Paragraph 3. Install and torque per instructions outlined in the applicable CMM.
B. Inspect evacuation system as follows:
(1). Gain access to the reservoir and valve assembly and inspect fusible plug for lot number.
(2). If fusible plug, B13984-3, has a lot number of PA-21 or PA-22 remove, discard, and replace with new fusible plug and O-Ring from EDR Kit, reference Paragraph 3. Install and torque per instructions outlined in the applicable CMM.
(3). Repack evacuation system per applicable folding procedure.
(4). Mark “Inspected/Replaced per S.B. BAe146 201-25-23” in minimum 1/4 inch high characters adjacent to the part identification on the reservoir and valve assembly and adjacent nomenclature placard on the girt with indelible contrasting ink.
(5). Return to service.
S.B. BAe 146 201-25-23 Page 4 of 7 ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
3. Material Information A. The below EDR (Engineering Data Release) Kit is needed to modify one inflation valve.
* see paragraph 1.G.
New P/N QTY .
Unit List Price Key Word Old P/N Disposition EDR 90-1495-101 1* K i t - Consisting of:
B14056-906 1 - O-Ring B14056-906 Install per CMM 25-65-16 B13984-3 1 - Fusible Plug B13984-3 Install per- CMM 25-65-16
S.B. BAe 146 201-25-23 Page 5 of 7 ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
LOCATION OF RESERVOIR AND VALVE ASSEMBLY FIGURE 1
EVACUATION SLIDE/RAFT
RESERVOIR AND VALVE ASSEMBLY
LOCATED ON THE UNDERSIDE OF
THE SLIDE/RAFT
S.B. BAe 146 201-25-23 Page 6 of 7 ISSUE DATE: 10 Dec 2010
SERVICE BULLETIN
TYPICAL LOCATION OF FUSIBLE PLUG ON VALVE FIGURE 2
FUSIBLE PLUG
INFLATION VALVE
WITH O-RING
S.B. BAe 146 201-25-23 Page 7 of 7 ISSUE DATE: 10 Dec 2010