Copy · BD500-501003_Issue003 · 104 pages

© Airbus Canada Limited Partnership. Filed by the FAA in regulations.gov docket FAA-2025-0199, the docket of AD 2026-10-10. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '5d00a96e0659e92eb35ecb2d367168c1431c37e5e5cc95c9e37d8dd28094fe23'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

BD500-501003

Cargo and Accessory Compartment - Cargo Compartments - Installation of Sleeve on the Environmental Control System Ducts - Service Bulletin BD500-501003 Issue No. 003.00 Copyright © Airbus Canada Limited Partnership All rights reserved. No part of this work may be reproduced or copied in any form or by any means without written permission of Airbus Canada Limited Partnership.

The Airbus and A220 logos are registered trademarks of Airbus Canada Limited Partnership.

The information, technical data and the designs disclosed herein are the exclusive property of Airbus Canada Limited Partnership or contain proprietary rights of others and are not to be used or disclosed to others without the written consent of Airbus Canada Limited Partnership. The recipient of this document, by its retention and use, agrees to hold in confidence the technical data and designs contained herein. The foregoing shall not apply to persons having proprietary rights to such information, technical data or such designs to the extent that such rights exist.

Publication No.:

Manufacturer:

Airbus Canada Limited Partnership Customer Services 13100 Henri-Fabre Blvd.

Mirabel, Quebec J7H 3C6 Page 1 2024/12/18 Original issue date: --2023-12-21

Intentionally left blank 2024/12/18 Original issue date: --2023-12-21

BD500-501003 Cargo and Accessory Compartment - Cargo Compartments - Installation of Sleeve on the Environmental Control System Ducts - Service Bulletin References Table 1 References Data Module/Technical Publication Title BD500-A-J50-10-03-01AAA-933A-A PART A - Installation of Sleeve on the Environmental Control System Ducts - Accomplishment instruction BD500-A-J50-10-03-01AAA-934A-A Installation of Sleeve on the Environmental Control System Ducts - Material information BD500-A-J50-10-03-02AAA-910B-A APPENDIX A - Miscellaneous BD500-A-J50-10-03-02AAA-933A-A PART B - Identification of the Ceiling Panel liners in the Cargo Compartments - Accomplishment instruction Service Bulletin Common information THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT, SEND THE SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR

HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND

THIS SERVICE BULLETIN TO THE NEW OWNER, UNLESS CONFIRMATION WAS

RECEIVED THAT AIRBUS HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST.

Management information Compliance category: Mandatory (Service bulletin must be accomplished) Task category: Inspection and repair Original issue date: 2023-12-21 Impact list Impact (Maintenance publications):

Refer to the Documentation affected section of the Planning Information section.

Accomplishment limits Time compliance: Basic limit Remarks:

Refer to the Compliance section of the Planning Information section.

Replacement service bulletin None See applicability on the first page of the DM BD500-A-J50-10-03-00AAA-930A-A (003) BD500-A-J50-10-03-00AAA-930A-A (003) 2024-12-18 Page 3 Original issue date: --2023-12-21

BD500-501003 Revision information Revision information The revision information letter transmits:

Issue 003 of Service Bulletin BD500-501003, dated 2024-12-18.

Additional work For Aircraft that have incorporated issue 001 of this service bulletin, it is necessary to do PART B to identify the cargo compartment ceiling panel liners and report the result.

Revision reason Revised the Planning information to:

Change the Compliance section to Mandatory.

Change the revision of some referenced documents.

Revision history Issue 001, dated 2023-12-21 Issue 002, dated 2024-11-15 Revision sequence Discard the copy of Service Bulletin BD500-501003, Issue 002, dated 2024-11-15. Replace with the copy attached.

Summary Applicability BD-500-1A10, Aircraft 50060, 50062, and 50063 BD-500-1A11, Aircraft 55128 thru 55150, 55152, 55154, and 55155 Reason It is possible that some Environmental Control System (ECS) ducts do not comply with the flammability requirements.

Description This service bulletin is divided into two parts: PART A and PART B PART A - Installation of Sleeve on the Environmental Control System Ducts The aircraft is put in standard configuration for maintenance. The Forward Cargo Compartment Door (FCCD) and Aft Cargo Compartment Door (ACCD) are opened. Some cargo compartment sidewalls are removed. The lot numbers are examined on four ECS ducts and recorded in the APPENDIX A. If necessary, the cargo compartment ceiling panels are removed and the Safran Cabin Service Bulletin F493000-50-06 is done. Ceiling panels are identified. If they were removed, the cargo compartment ceiling panels are installed. Some cargo compartment sidewalls are installed. The FCCD and ACCD are closed.

PART B - Identification of the Ceiling Panel liners in the Cargo Compartments See applicability on the first page of the DM BD500-A-J50-10-03-00AAA-930A-A (003) BD500-A-J50-10-03-00AAA-930A-A (003) 2024-12-18 Page 4 Original issue date: --2023-12-21

BD500-501003 The aircraft is put in standard configuration for maintenance. The FCCD and ACCD are opened. Some cargo compartment sidewalls are removed. The lot numbers are examined on four ECS ducts and recorded in the APPENDIX A. Ceiling panels are identified. Some cargo compartment sidewalls are installed. The FCCD and ACCD are closed.

Concurrent requirements None Manpower It will take an estimated 12.00 h to complete PART A of this service bulletin.

Note This estimate does not include the man-hours necessary to do Safran Cabin Service Bulletin F493000-50-06.

It will take an estimated 6.00 h to complete PART B of this service bulletin.

Material information BD500-A-J50-10-03-01AAA-934A-A Planning information Applicability Aircraft affected:

AIRCRAFT MODEL SERVICE AIRCRAFT SERIAL NUMBER

PRODUCTION AIRCRAFT

SERIAL NUMBERS BD-500-1A10 50060, 50062, and 50063 50067 and subsequent serial numbers 1 BD-500-1A11 55128 thru 55150, 55152, 55154, and 55155 55160, 55164 and subsequent serial numbers1 1 Aircraft will have an equivalent modification incorporated before delivery.

Note The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Airbus Service Bulletins.

Before you do this service bulletin, examine all Supplemental Type Certificates (STCs), Supplemental Type Approvals (STAs), or equivalent action changes to make sure that you can complete this service bulletin.

Reason Problem and effect It is possible that some ECS ducts do not comply with the flammability requirements.

Objective/Solution See applicability on the first page of the DM BD500-A-J50-10-03-00AAA-930A-A (003) BD500-A-J50-10-03-00AAA-930A-A (003) 2024-12-18 Page 5 Original issue date: --2023-12-21

BD500-501003 This service bulletin gives the procedure to examine the lot numbers on four ECS ducts, record the lot numbers in the APPENDIX A, and if necessary, do the Safran Cabin Service Bulletin F493000-50-06 to add a sleeve to the ECS ducts to obey the flammability requirements.

Description This service bulletin is divided into two parts: PART A and PART B PART A - Installation of Sleeve on the Environmental Control System Ducts The aircraft is put in standard configuration for maintenance. The FCCD and ACCD are opened. Some cargo compartment sidewalls are removed. The lot numbers are examined on four ECS ducts and recorded in the APPENDIX A. If necessary, the cargo compartment ceiling panels are removed and the Safran Cabin Service Bulletin F493000-50-06 is done. Ceiling panels are identified. If they were removed, the cargo compartment ceiling panels are installed.

Some cargo compartment sidewalls are installed. The FCCD and ACCD are closed.

PART B - Identification of the Ceiling Panel liners in the Cargo Compartments The aircraft is put in standard configuration for maintenance. The FCCD and ACCD are opened. Some cargo compartment sidewalls are removed. The lot numbers are examined on four ECS ducts and recorded in the APPENDIX A. Ceiling panels are identified. Some cargo compartment sidewalls are installed. The FCCD and ACCD are closed.

Compliance Mandatory Service Bulletin Airbus recommends that PART A and/or PART B of this service bulletin be done before the aircraft has 9350 flight hours or no later than 60 months from the release date of the initial issue on this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator.

Note If it is not possible to complete all the instructions in this service bulletin because of the configuration of the aircraft, speak with a CRC representative at 1 866 A220 CRC (1-866-222-0272) or 1-450-476-7676 or e-mail at a220crc@airbus.com for analysis and to get an approved disposition to complete this service bulletin.

Note This service bulletin does not affect Airworthiness Limitations Items (ALIs) or Damage Tolerance Inspections (DTIs).

Concurrent requirements None Approval The technical content of this service bulletin has been approved under the authority of the TCCA Design Approval Organization No: DAO #19-Q-02.

Manpower The man-hours given below are estimates for direct labor done by an experienced crew on an aircraft prepared for maintenance.

These estimates do not include the time necessary for:

See applicability on the first page of the DM BD500-A-J50-10-03-00AAA-930A-A (003) BD500-A-J50-10-03-00AAA-930A-A (003) 2024-12-18 Page 6 Original issue date: --2023-12-21

BD500-501003 ‐ Administrative functions such as planning, liaising, familiarization, and report writing.

‐ Non-productive elapsed time such as rest time, having meals, and crew shift changes.

‐ Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.

‐ Preparation for modification (unless specified in the Accomplishment Instructions) such as cleaning and getting parts, tools, consumables, and ground equipment.

‐ Quality assurance inspections, troubleshooting and/or correction of discrepancies found when a task is done.

‐ All other activities that are not considered by Airbus as directly related to the accomplishment of this procedure.

It will take an estimated 12.00 h to complete PART A of this service bulletin. The man-hours are divided as shown in the table that follows:

TASK MAN-HOURS Job Set-Up 2.00 h Procedure 7.00 h Test 1.00 h Job Close-Up 2.00 h Note These estimates do not include the man-hours necessary to do Safran Cabin Service Bulletin F493000-50-06.

It will take an estimated 6.00 h to complete PART B of this service bulletin. The man-hours are divided as shown in the table that follows:

TASK MAN-HOURS Job Set-Up 2.00 h Procedure 2.00 h Test 0.00 h Job Close-Up 2.00 h Weight and balance Not changed Electrical load data Not changed Referenced documentation Refer to the SB Introduction document BD500-000000 for definition or explanation of service bulletin content.

Modification Summary 500T105050, Revision B See applicability on the first page of the DM BD500-A-J50-10-03-00AAA-930A-A (003) BD500-A-J50-10-03-00AAA-930A-A (003) 2024-12-18 Page 7 Original issue date: --2023-12-21

BD500-501003 For Airbus reference only: Restriction and/or Special Instruction (RSI) C-500-000-50-0004, Revision C Safran Cabin Service Bulletin F493000-50-06, Revision 1, dated Oct 31/24 For Airbus reference only: PCR 60543 Documentation affected 1 Maintenance Publications Aircraft Maintenance Publication (AMP) Illustrated Parts Data Publication (IPDP) 2 Operational Publications None Industry support information This service bulletin is part of an AIRBUS monitored retrofit campaign. For detailed information, please refer to Retrofit Information Letter (RIL) S25M23001960. To organize this retrofit, please contact AIRBUS retrofit management department at: a220monitored.retrofit@airbus.com.

Material information BD500-A-J50-10-03-01AAA-934A-A Accomplishment instructions For PART A BD500-A-J50-10-03-01AAA-933A-A For PART B BD500-A-J50-10-03-02AAA-933A-A Additional information Additional information APPENDIX A BD500-A-J50-10-03-02AAA-910B-A See applicability on the first page of the DM BD500-A-J50-10-03-00AAA-930A-A (003) BD500-A-J50-10-03-00AAA-930A-A (003) End of data module 2024-12-18 Page 8 Original issue date: --2023-12-21

BD500-501003 Installation of Sleeve on the Environmental Control System Ducts - Material information References Table 1 References Data Module/Technical Publication Title BD500-A-J51-31-00-01AAA-070A-A Supply requirements - Consumables and materials Service Bulletin Material set list None Support equipment list There is no support equipment for this service bulletin.

Supplies list For a list of supplies, refer to the different tasks and the Safran Cabin Service Bulletin that are given as references in this service bulletin.

Spares list The spare that follows is available from Satair:

Applicability: 50060, 50062-50063, 55128-55150, 55152, 55154-55155 ▸ Individual spare:

◂ Part number [Mfg. code] Name Quantity Remarks B0816123-7-0 [3AB48] Strap, Tiedown 4 The spare sets in the table that follows are available from Satair:

Applicability: 50060, 50062-50063 See applicability on the first page of the DM BD500-A-J50-10-03-01AAA-934A-A (003) BD500-A-J50-10-03-01AAA-934A-A (003) 2024-12-18 Page 9 Original issue date: --2023-12-21

BD500-501003 ▸ Spare set: Kit BD500501003K350 ◂ Name: ECS Duct Improvement A220-100 Kit Part number [Mfg. code] Name Quantity Remarks CDKF49-3-53 [56135] ECS Duct Improvement- A220-100 1 Procurement information:

Price information: $4840.00 Availability: 111 days (calendar days from receipt of order)

NOTE(S) The sales terms (costs and availability) are estimated in relation to economic conditions.

The latest valid price and lead time for ordering purposes shall be obtained thru Satair Customer Order Specialist: Americas: spares.americas@satair.com, Asia:

spares.aspac@satair.com Europe and Africa: spares.emea@satair.com.

Applicability: 55128-55150, 55152, 55154-55155 ▸ Spare set: Kit BD500501003K351 ◂ Name: ECS Duct Improvement A220-300 Kit Part number [Mfg. code] Name Quantity Remarks CDKF49-3-54 [56135] ECS Duct Improvement- A220-300 1 Procurement information:

Price information: $4840.00 Availability: 111 days (calendar days from receipt of order)

NOTE(S) The sales terms (costs and availability) are estimated in relation to economic conditions.

The latest valid price and lead time for ordering purposes shall be obtained thru Satair Customer Order Specialist: Americas: spares.americas@satair.com, Asia:

spares.aspac@satair.com Europe and Africa: spares.emea@satair.com.

Procurement address:

Name: For customers based in the Americas Business unit:

Business unit name: Satair USA, Inc 525 Westpark Drive, Suite 400 Peachtree City, GA 30269 See applicability on the first page of the DM BD500-A-J50-10-03-01AAA-934A-A (003) BD500-A-J50-10-03-01AAA-934A-A (003) 2024-12-18 Page 10 Original issue date: --2023-12-21

BD500-501003 United States of America Ph.: 1 404 675 6333 Please contact your Customer Order Specialist https:/www.satair.com/market/search CPHSB7X Name: For customers based in Europe, Middle East, Africa Business unit:

Business unit name: Satair A/S Amager Landevej 147A 2770 Kastrup Denmark Ph.: 45 3247 0100 Please contact your Customer Order Specialist https:/www.satair.com/market/search CPHSB7X Name: For customers based in the Asia Pacific (excluding mainland China) Business unit:

Business unit name: Satair Pte Ltd 12 Seletar Aerospace Link Singapore 797553 The Republic of Singapore Ph.: 65 6543 0977 Please contact your Customer Order Specialist https:/www.satair.com/market/search CPHSB7X Name: For customers based in mainland China Business unit:

Business unit name: Satair (Beijing) Co. Ltd Tian Zhu Lu 8, Tianzhu Airport Industrial Zone Beijing 101312 People’s Republic of China Ph.: 86 10 8048 6161 Please contact your Customer Order Specialist https:/www.satair.com/market/search CPHSB7X Removed spares list Individual removed spare:

Pre-SB Part number [Mfg. code] Name Qty Usage Post-SB Part number [Mfg. code] Description (Repl. condition) [Repl. code] D761105-121 [56135] Ceiling Assembly, FWD 1 Modified to KC25060543001-101 or KC25060543001-201 [56135] See applicability on the first page of the DM BD500-A-J50-10-03-01AAA-934A-A (003) BD500-A-J50-10-03-01AAA-934A-A (003) 2024-12-18 Page 11 Original issue date: --2023-12-21

BD500-501003 Individual removed spare:

Pre-SB Part number [Mfg. code] Name Qty Usage Post-SB Part number [Mfg. code] Description (Repl. condition) [Repl. code] D761103-113 [56135] Ceiling Assembly, FWD 1 Modified to KC25060543001-103 or KC25060543001-203 [56135] Individual removed spare:

Pre-SB Part number [Mfg. code] Name Qty Usage Post-SB Part number [Mfg. code] Description (Repl. condition) [Repl. code] D761104-109 [56135] Ceiling Assembly, FWD 1 Modified to KC25060543001-105 or KC25060543001-205 [56135] Individual removed spare:

Pre-SB Part number [Mfg. code] Name Qty Usage Post-SB Part number [Mfg. code] Description (Repl. condition) [Repl. code] D765101-113 [56135] Ceiling Assembly, FWD 1 Modified to KC25060543001-113 or KC25060543001-213 [56135] Individual removed spare:

Pre-SB Part number [Mfg. code] Name Qty Usage Post-SB Part number [Mfg. code] Description (Repl. condition) [Repl. code] D761134-111 [56135] Ceiling Assembly, Aft 1 Modified to KC25060543001-107 or KC25060543001-207 [56135] See applicability on the first page of the DM BD500-A-J50-10-03-01AAA-934A-A (003) BD500-A-J50-10-03-01AAA-934A-A (003) End of data module 2024-12-18 Page 12 Original issue date: --2023-12-21